Crazy Horse SWD
Crazy Horse SWD
  • Home
  • Contact

Built for Volume. Engineered for Reliability.

Built for Volume. Engineered for Reliability.Built for Volume. Engineered for Reliability.Built for Volume. Engineered for Reliability.

West Texas Salt Water Disposal

60,000 BPD capacity. Produced water disposal and waste oil processing.

Contact Operations

60,000 BPD Capacity

Experienced Operations Team

Permian Basin Focused

Permian Basin Focused

Experienced Operations Team

Permian Basin Focused

Pipeline + Truck Offload

Experienced Operations Team

Experienced Operations Team

Experienced Operations Team

Experienced Operations Team

Experienced Operations Team

Built to Handle Permian Basin Demand

60,000 BPD Capacity
High-volume disposal


Pipeline + Truck Offload
Flexible intake


Frac Tank Handling
Washout & fluid management


High-Volume Throughput
Faster turnaround

SERVICES & CAPABILITIES

Produced Water Disposal

Produced Water Disposal

Produced Water Disposal

  • High-volume SWD 
  • 24/7 disposal lanes 
  • Competitive pricing

Solids control

Produced Water Disposal

Produced Water Disposal

  • Hydrocarbon recovery 
  • Pipeline-quality output 
  • Reusable drilling fluids

Waste Oil Disposal

Produced Water Disposal

Waste Oil Disposal

  • Tank bottoms 
  • Spill residues 
  • Off-spec crude

DESIGNED FOR HIGH-VOLUME DISPOSAL, EFFICIENT THROUGHPUT, AND RELIABLE OPERATIONS.

FIELD OPERATIONS

Produced Water

Produced Water

Produced Water

High-volume disposal with 24/7 lane access

Frac Tanks

Produced Water

Produced Water

On-site handling, washout, and fluid management

Washout

Produced Water

Washout

Efficient cleaning and turnaround for equipment and tanks

keep in touch

Keep Up With The Industry

Copyright © 2026 Crazy Horse SWD - All Rights Reserved.

  • Home
  • Contact

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept